Project Brief We were asked to design a multi-service support bridge that could carry both water, gas, & air pipework and cable containment, spanning 15 metres from...
Project Brief Our brief was to design and create multiple structural frames at a global pharmaceutical HQ. The frames were vital to support both high and low grade,...
Project Brief As part of this treatment works’ asset management plan, the tank system requires cleaning every couple of years.
Project Brief MIDFIX was appointed to design and cost multi-level containment brackets to support HV and LV electrical services at high level, independent of the plant...
Project Brief MIDFIX was appointed to provide a support solution for connecting pipework between the main plant and tanks at a sewage treatment works in the West...