STOR Project

Project Brief

MIDFIX was appointed to design and cost multi-level containment brackets to support HV and LV electrical services at high level, independent of the plant and equipment but allowing personnel access for regular maintenance.

Solution

This project was challenging due to very limited time constraints, MIDFIX only had 3 days to design and pre-fabricate.

In this instance, we selected the Sikla Framo product for securing heavy cable ladder, pipework and trays at height. Our design engineering experts created the full design with load calculations. Once the designs were approved by our client, this was handed over to our pre-fabrication specialists to assemble then delivered to site for installation. All materials and an installation guide is provided to the contractor for installation.