Project Brief This was a £5.3m project to upgrade an Anglian Water water recycling facility on a site in Essex. The works included over 250m of above ground pipework...
![](https://case-studies.midfix.co.uk/hubfs/ezgif-4-602e42e13e.jpg)
Project Brief This £20m new build hotel in Stoke-on-Trent is an eight-storey tall building, featuring 140 bedrooms with a gym, bar and bistro.
![](https://case-studies.midfix.co.uk/hubfs/ezgif-4-51c76e77c4.jpg)
Project Brief This scheme was a fast-track new build project which took 18 months from inception to completion at a university in the West Midlands. MIDFIX was...
![](https://case-studies.midfix.co.uk/hubfs/ezgif-4-b5b3fcddc0.jpg)
Project Brief As part of the regeneration plans to transform Woking town centre, the Victoria Square development is making substantial progress for phased completion...
![](https://case-studies.midfix.co.uk/hubfs/ezgif-1-98ab5f5553.jpg)
Project Brief In recent years, European countries have committed to a major energy transition in order to meet our growing energy demand and address energy security...
![](https://case-studies.midfix.co.uk/hubfs/ezgif-1-6110b7f297.jpg)
Project Brief We were commissioned to work on a factory site in Coventry to design compact cable containment and pipe support frames running the edge of a warehouse to...
![](https://case-studies.midfix.co.uk/hubfs/ezgif-1-61960d53f8.jpg)
“We need you to design and engineer supports for the gas pipework, all electrical containment, and the entire siphonic drainage system for an aircraft hangar” This is...
![](https://case-studies.midfix.co.uk/hubfs/ezgif-5-fc45a1d50b.jpg)
Project Brief MIDFIX was appointed to design, engineer, and supply the full pipework support system for a Yorkshire Water treatment site located in Leeds as part of a...
![](https://case-studies.midfix.co.uk/hubfs/ezgif-5-eb2805dbf1.jpg)
Project Brief Rising amongst the skyscrapers that shape the Canary Wharf skyline is Newfoundland, a striking diagrid structure, due to complete during the 2nd quarter...
![](https://case-studies.midfix.co.uk/hubfs/ezgif-5-2c18f680fc.jpg)
Project Brief MIDFIX was pleased to be part of the project team to work on a prestigious £36.7m water park, The Wave in Coventry. The brief was simple: we were given a...